{"id":1682,"date":"2010-08-09T15:03:10","date_gmt":"2010-08-09T20:03:10","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=1682"},"modified":"2010-10-13T11:46:22","modified_gmt":"2010-10-13T16:46:22","slug":"rapidways-just-around-the-corner","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2010\/08\/09\/rapidways-just-around-the-corner\/","title":{"rendered":"Rapidways just around the corner"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter size-full wp-image-1687\" title=\"enterprise-009_new\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2010\/08\/enterprise-009_new.jpg\" alt=\"enterprise-009_new\" width=\"450\" height=\"301\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2010\/08\/enterprise-009_new.jpg 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2010\/08\/enterprise-009_new-300x201.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p>Earlier this summer, our communications team visited the site of a rapidway being built along <a href=\"http:\/\/www.vivanext.com\/highway7_markham\" target=\"_blank\">Enterprise Drive in Markham<\/a>. The sun was shining and work was well underway as a construction crew installed the roadway\u2019s curb and gutter. Dick Clark, general superintendent of construction, filled us in on the work being done and shared his thoughts on transit in York Region. You can check out the video <a href=\"http:\/\/www.youtube.com\/watch?v=SFc64KjHBsw\" target=\"_blank\">here<\/a>.<\/p>\n<p>Last week, we returned to Enterprise Drive to see the progress of work since our last visit. Beautiful summer weather has allowed construction to forge ahead without any major interruptions. What does this mean? Incredible progress!<\/p>\n<p>The Enterprise rapidway is really starting to take shape. Some sections have been paved with the base coating, and preparatory work has already started for the installation of station platforms!\u00a0 We brought our camera along to once again give you the inside scoop. Click <a href=\"http:\/\/www.youtube.com\/watch?v=gb3FE7tFdRo\" target=\"_blank\">here<\/a> to view the latest video.<\/p>\n<p>We often talk about the future on this blog \u2013 how York Region is planning for future growth, what future development may look like, and the importance of the vivaNext plan in our community. Sometimes, this future may seem like a distant reality, but the truth is that it\u2019s never been closer. The Enterprise Drive rapidway is on schedule to be completed by the end of this year \u2013 which means that vivaNext rapidways in York Region are just around the corner.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Earlier this summer, our communications team visited the site of a rapidway being built along Enterprise Drive in Markham. The sun was shining and work was well underway as a construction crew installed the roadway\u2019s curb and gutter. Dick Clark, general superintendent of construction, filled us in on the work being done and shared his [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[39,943,401,268,114,47,34,402,7],"class_list":["post-1682","post","type-post","status-publish","format-standard","hentry","category-rapidways","tag-bus-rapid-transit","tag-construction","tag-dick-clark","tag-enterprise-drive","tag-highway-7","tag-markham","tag-rapidway","tag-station-platforms","tag-vivanext"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/1682","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=1682"}],"version-history":[{"count":6,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/1682\/revisions"}],"predecessor-version":[{"id":1831,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/1682\/revisions\/1831"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=1682"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=1682"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=1682"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}