{"id":2400,"date":"2012-05-16T16:28:55","date_gmt":"2012-05-16T21:28:55","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=2400"},"modified":"2012-05-16T16:28:55","modified_gmt":"2012-05-16T21:28:55","slug":"davis-drive-open-house-results","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2012\/05\/16\/davis-drive-open-house-results\/","title":{"rendered":"Davis Drive Open House Results"},"content":{"rendered":"<p><a href=\"http:\/\/www.vivanext.com\/249\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-2067\" title=\"Click here to see our open house information on our website\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2012\/05\/Blog_image_May16_2012.png\" alt=\"Click here to see our open house information on our website\" width=\"450\" height=\"198\" \/><\/a>Did you attend our Davis Drive open house on May 15? The event saw a great turnout, with residents and vivaNext representatives discussing what\u2019s coming next for rapidway construction along Davis Drive.<\/p>\n<p>If you weren\u2019t able to attend the open house, all of the materials that were shared are available on our <a title=\"Past Meetings - Davis Drive, Newmarket\" href=\"http:\/\/www.vivanext.com\/249\" target=\"_blank\">Past Meetings<\/a> page, so you can read up on the latest information that you may have missed. You can also <a title=\"Sign Up for Project Updates\" href=\"http:\/\/www.vivanext.com\/456\" target=\"_blank\">sign up for project updates<\/a>.<\/p>\n<p>Thank you to everybody that came out to learn more about vivaNext construction. It was great to speak with residents about the future of the Davis Drive rapidway. Be sure to check back on the vivaNext website for information about any upcoming open house events. We hope to see you there!<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Did you attend our Davis Drive open house on May 15? The event saw a great turnout, with residents and vivaNext representatives discussing what\u2019s coming next for rapidway construction along Davis Drive. If you weren\u2019t able to attend the open house, all of the materials that were shared are available on our Past Meetings page, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[77,30],"tags":[943,92,49,14,34,6,7,9],"class_list":["post-2400","post","type-post","status-publish","format-standard","hentry","category-community-events","category-rapidways","tag-construction","tag-davis-drive","tag-newmarket","tag-rapid-transit","tag-rapidway","tag-viva","tag-vivanext","tag-york-region"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/2400","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=2400"}],"version-history":[{"count":6,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/2400\/revisions"}],"predecessor-version":[{"id":2408,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/2400\/revisions\/2408"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=2400"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=2400"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=2400"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}