{"id":3275,"date":"2013-10-18T07:36:15","date_gmt":"2013-10-18T12:36:15","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=3275"},"modified":"2013-10-18T07:36:15","modified_gmt":"2013-10-18T12:36:15","slug":"working-together%e2%80%a6","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2013\/10\/18\/working-together%e2%80%a6\/","title":{"rendered":"working together\u2026."},"content":{"rendered":"<p><a href=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2013\/10\/Oct17_blog_image_vmc.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3276\" title=\"Oct17_blog_image_vmc\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2013\/10\/Oct17_blog_image_vmc.png\" alt=\"\" width=\"450\" height=\"278\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2013\/10\/Oct17_blog_image_vmc.png 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2013\/10\/Oct17_blog_image_vmc-300x185.png 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>If you get vivaNext email updates, you probably recently read that Yorkie and Torkie the tunnel boring machines are munching their way closer and closer to Highway 7 and the Vaughan Metropolitan Centre (VMC).<\/p>\n<p>This is great news, and means that the reality of a subway coming to York Region is getting closer every day.\u00a0 But while the tunneling project is very high profile, vivaNext is also working hard to get ready for the subway opening at our VMC station. \u00a0\u00a0Unlike other vivastations which we are building independently, the VMC station construction needs to be closely coordinated with the subway project, adding a whole new level of complexity.\u00a0 Here\u2019s a little background:<\/p>\n<p>The VMC station will be located at Millway Avenue and Highway 7, as part of the VMC development area.\u00a0 To provide passengers with seamless connections between the subway and the viva\\YRT system, the subway station will be located on the lower level, with a concourse linking the subway to the vivastation above.<\/p>\n<p>That may all sound relatively straightforward, but in fact there are significant engineering challenges involved with constructing a complicated building in the middle of a live highway, especially \u00a0when there\u2019s a separate construction project going on directly underneath.\u00a0 One of our top priorities is to ensure while we\u2019re building the station to our own design plans, it also ties in to all the complex TTC systems down below so that everything works properly and in sync.<\/p>\n<p>Some key elements such as escalators, elevators and stairways link the two structures. These need to be in place so the TTC can access the upstairs while they\u2019re building their subway station down below. Escalators and elevator shafts aren\u2019t very forgiving, so we need to work closely together to make sure all the elements line up perfectly.<\/p>\n<p>Another challenge is that there\u2019s not a lot of space to work given the location of the station in the middle of Highway 7.\u00a0 From time to time we\u2019re literally going to be working right on top of each other.\u00a0 So we will be doing a lot of coordinating throughout the process to make sure all our contractors and subcontractors have enough room to do their jobs safely and in parallel.<\/p>\n<p>The main priority for vivaNext and the TTC is that both parts of the VMC station are open when the subway service begins.\u00a0 There\u2019s a huge amount of work to be done between now and then, and we\u2019ll be working closely with our TTC partners during the course of construction.<\/p>\n<p>So stay tuned, and soon I\u2019ll be giving you a proper tour of the VMC station design.\u00a0 It\u2019s going to be a showpiece that will be worth all the hard work.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>If you get vivaNext email updates, you probably recently read that Yorkie and Torkie the tunnel boring machines are munching their way closer and closer to Highway 7 and the Vaughan Metropolitan Centre (VMC). This is great news, and means that the reality of a subway coming to York Region is getting closer every day.\u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[96,53],"tags":[8,943,114,146,45,10,13,21,139,44,48,175,6,7,70],"class_list":["post-3275","post","type-post","status-publish","format-standard","hentry","category-construction","category-general","tag-connections","tag-construction","tag-highway-7","tag-spadina-extension","tag-subway","tag-subway-extension","tag-toronto","tag-transit","tag-ttc","tag-tunnel-boring","tag-vaughan","tag-vaughan-metropolitan-centre","tag-viva","tag-vivanext","tag-vivastation"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=3275"}],"version-history":[{"count":2,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3275\/revisions"}],"predecessor-version":[{"id":3278,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3275\/revisions\/3278"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=3275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=3275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=3275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}