{"id":3789,"date":"2014-08-03T09:15:33","date_gmt":"2014-08-03T14:15:33","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=3789"},"modified":"2014-08-03T07:57:50","modified_gmt":"2014-08-03T12:57:50","slug":"check-out-the-keith-bridge-progress","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2014\/08\/03\/check-out-the-keith-bridge-progress\/","title":{"rendered":"check out the Keith Bridge progress"},"content":{"rendered":"<p><a title=\"video - Davis Drive: Keith Bridge progress\" href=\"http:\/\/www.vivanext.com\/davis-drive-newmarket\/related\/gallery\/10214\/\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3794\" title=\"video - Davis Drive: Keith Bridge progress\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2014\/08\/Aug01_keithbridge.png\" alt=\"video - Davis Drive: Keith Bridge progress\" width=\"450\" height=\"266\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/08\/Aug01_keithbridge.png 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/08\/Aug01_keithbridge-300x177.png 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>It\u2019s an exciting time for Newmarket as significant components of the Davis Drive rapidway project are beginning to take shape. Along with road widening and paving, construction of the <a title=\"BLOG: Here comes the first davis drive vivastation\" href=\"http:\/\/vivanext.com\/blog\/2014\/07\/08\/building-for-the-future-here-comes-the-first-davis-drive-vivastation\/\" target=\"_blank\">first vivastation<\/a> is underway at Parkside\/Longford and Davis. As part of the vivaNext rapidway project on Davis Drive, the Keith Bridge is being completely reconstructed. Construction of the north side of the bridge is coming along and recently, the new bridge deck was poured with concrete. We\u2019re excited to have captured part of the transformation!<\/p>\n<p>The deck pour was originally scheduled to be a lengthy 16 hour operation, but to speed up the process our diligent crews brought in additional machines and completed the job in 8 hours \u2013 half the time. The pour was completed overnight, with crews working quickly and efficiently to minimize disruption to residents. Over 70 truckloads of concrete were pumped steadily into the form work of the bridge [similar to a mold]. Using what\u2019s called a screed machine, the concrete was leveled out and smoothed to create a flat surface. Because the screed machine didn\u2019t reach the outer edges of the bridge, workers expertly finished off the edges with hand trowels. Finally burlap and tarps were used to cover the poured concrete as part of the curing process. They were removed once the concrete set.<\/p>\n<p>The bridge is on track to be completed by late 2014, and when finished it will include architectural features such as replica period light fixtures and poles, and decorative concrete railings that reflect Newmarket\u2019s heritage. Check out the <a title=\"video - Davis Drive: progress at Keith Bridge\" href=\"http:\/\/www.vivanext.com\/davis-drive-newmarket\/related\/gallery\/10214\/\" target=\"_blank\">bridge pour video<\/a> for yourself \u2013 after all, it\u2019s not every day over 70 truckloads of concrete are poured in one continuous operation. Watch for more big moves as the transformation continues to unfold on Davis Drive!<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>It\u2019s an exciting time for Newmarket as significant components of the Davis Drive rapidway project are beginning to take shape. Along with road widening and paving, construction of the first vivastation is underway at Parkside\/Longford and Davis. As part of the vivaNext rapidway project on Davis Drive, the Keith Bridge is being completely reconstructed. Construction [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[96,30,1],"tags":[943,92,49,34,7,9],"class_list":["post-3789","post","type-post","status-publish","format-standard","hentry","category-construction","category-rapidways","category-uncategorized","tag-construction","tag-davis-drive","tag-newmarket","tag-rapidway","tag-vivanext","tag-york-region"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3789","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=3789"}],"version-history":[{"count":9,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3789\/revisions"}],"predecessor-version":[{"id":3805,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3789\/revisions\/3805"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=3789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=3789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=3789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}