{"id":3908,"date":"2014-09-24T15:41:41","date_gmt":"2014-09-24T20:41:41","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=3908"},"modified":"2014-09-26T09:38:56","modified_gmt":"2014-09-26T14:38:56","slug":"yonge-street-rapidway-%e2%80%93-a-key-connection","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2014\/09\/24\/yonge-street-rapidway-%e2%80%93-a-key-connection\/","title":{"rendered":"yonge street rapidway \u2013 a key connection"},"content":{"rendered":"<p><a title=\"video: Yonge Street rapidway is on the way\" href=\"http:\/\/www.vivanext.com\/yonge-street-richmond-hill\/related\/gallery\/11258\/\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3913\" title=\"video: Yonge St rapidway is on the way\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2014\/09\/09_24_2014_blog_image1.png\" alt=\"video: Yonge St rapidway is on the way\" width=\"450\" height=\"266\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/09\/09_24_2014_blog_image1.png 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/09\/09_24_2014_blog_image1-300x177.png 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>Check out the newest vivaNext <a title=\"see the video: yonge street rapidway is on the way\" href=\"http:\/\/www.vivanext.com\/yonge-street-richmond-hill\/related\/gallery\/11258\/\" target=\"_blank\">video featuring the Yonge Street rapidway project<\/a>! This rapidway is a key part of York Region\u2019s transit network, and will connect with the Richmond Hill Centre\/Langstaff Urban Gateway at Highway 7 \u2013 a key <em>Regional Centre<\/em> with a variety of transit services and transportation options.<\/p>\n<p>Now that the contract has been awarded to <strong>RapidLINK<\/strong>, our next step will be to work closely with the contractor to finalize the design of the rapidway on Yonge Street and develop a construction schedule. Over the summer and through the fall and winter months, crews continue working along the Yonge Street corridor to prepare for construction.<\/p>\n<p>During this pre-construction phase, these teams will more accurately document existing conditions above and below the ground. This work is mainly conducted during off-peak driving hours and sometimes requires lane closures.<\/p>\n<p>Building a roadway is a process that follows clearly defined steps and uses modern technology, equipment and materials. Although we have access to some of the best, most experienced construction contractors, building the rapidway down the middle of some of the Region\u2019s busiest roads is a complicated undertaking. That said, we have an experienced team of dedicated staff and constructors who are on board and up for the challenge.<\/p>\n<p>During construction, we realize that it\u2019s important to minimize the impact on businesses and people using the road by keeping travel lanes open whenever possible and safe to do so. For more information on the project and construction information, visit <a title=\"www.vivanext.com\/yonge-street-richmond-hill\" href=\"http:\/\/www.vivanext.com\/yonge-street-richmond-hill\/\" target=\"_blank\">vivanext.com\/yonge-street-richmond-hill<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Check out the newest vivaNext video featuring the Yonge Street rapidway project! This rapidway is a key part of York Region\u2019s transit network, and will connect with the Richmond Hill Centre\/Langstaff Urban Gateway at Highway 7 \u2013 a key Regional Centre with a variety of transit services and transportation options. Now that the contract has [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[40,39,8,49,14,34,61,6,7,60,9],"class_list":["post-3908","post","type-post","status-publish","format-standard","hentry","category-rapidways","tag-brt","tag-bus-rapid-transit","tag-connections","tag-newmarket","tag-rapid-transit","tag-rapidway","tag-richmond-hill","tag-viva","tag-vivanext","tag-yonge-st","tag-york-region"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=3908"}],"version-history":[{"count":4,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3908\/revisions"}],"predecessor-version":[{"id":3914,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3908\/revisions\/3914"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=3908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=3908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=3908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}