{"id":3916,"date":"2014-10-01T15:59:59","date_gmt":"2014-10-01T20:59:59","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=3916"},"modified":"2014-10-03T13:57:52","modified_gmt":"2014-10-03T18:57:52","slug":"who-what-where-why-when-and-how-%e2%80%a6-of-davis-drive-construction","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2014\/10\/01\/who-what-where-why-when-and-how-%e2%80%a6-of-davis-drive-construction\/","title":{"rendered":"who, what, where, why, when and how \u2026..the 6ws of davis construction"},"content":{"rendered":"<p><a title=\"click to see the video - David Drive: building more than transit\" href=\"http:\/\/www.vivanext.com\/davis-drive-newmarket\/related\/gallery\/11332\/\" target=\"_blank\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-3917\" title=\"click here for the video Davis Drive: building more than transit\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2014\/10\/Oct1_blog_newmarket_rebuilt.png\" alt=\"click here for the video Davis Drive: building more than transit\" width=\"450\" height=\"248\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/10\/Oct1_blog_newmarket_rebuilt.png 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2014\/10\/Oct1_blog_newmarket_rebuilt-300x165.png 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>With Davis Drive rapidway construction well underway, signs of the transformation can be seen along Davis from Yonge Street to Roxborough Road. It takes a lot to build a centre-lane bus rapidway and completely rebuild Davis from the ground up. This challenging project has layers upon layers of complexity and a lot of work underground had to take place first. Check out our <a title=\"video - Davis Drive: building more than transit\" href=\"http:\/\/www.vivanext.com\/davis-drive-newmarket\/related\/gallery\/11332\/\" target=\"_blank\">latest video<\/a> about how all these layers add up to a project that\u2019s building more than transit.<\/p>\n<p>A lot of questions can come from a project of this nature, and here at vivaNext we\u2019re always happy to answer them. We thought it might be helpful to break down this complicated project into smaller pieces [like a story with chapters, if you will] to provide a clearer view of how we\u2019re transforming Davis.<\/p>\n<p>Over the coming weeks, we\u2019ll be using Twitter and Facebook to provide a unique behind-the-scenes perspective of the magnitude of work that\u2019s been done under and above ground, the progress we\u2019ve made, what\u2019s to come and of course the end result! We will even toss in a few intriguing facts about Davis Drive and the Town of Newmarket that you may not have known.<\/p>\n<p>What\u2019s a story without pictures? As part of the story, we\u2019ll provide visuals and use pictures to help showcase what\u2019s going on in particular photos. We hope you agree with the adage \u201ca picture is worth a thousand words.\u201d<\/p>\n<p>If you have a question you would like answered as part of our photo series, please contact us through <a title=\"email us at contactus@vivanext.com\" href=\"mailto:contactus@vivanext.com\">contactus@vivanext.com<\/a>, send us a tweet or a Facebook message.<\/p>\n<p>We hope you enjoy the story and that at the end of the last chapter, you see that the investment in modernizing our corridor, adding a rapid transit service and revitalizing the infrastructure, will go a long way to making sure Davis is built on a solid foundation that will serve the growing needs of Newmarket for many years to come<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>With Davis Drive rapidway construction well underway, signs of the transformation can be seen along Davis from Yonge Street to Roxborough Road. It takes a lot to build a centre-lane bus rapidway and completely rebuild Davis from the ground up. This challenging project has layers upon layers of complexity and a lot of work underground [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[96,30],"tags":[39,92,49,34,209,6,7,9],"class_list":["post-3916","post","type-post","status-publish","format-standard","hentry","category-construction","category-rapidways","tag-bus-rapid-transit","tag-davis-drive","tag-newmarket","tag-rapidway","tag-video","tag-viva","tag-vivanext","tag-york-region"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3916","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=3916"}],"version-history":[{"count":4,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3916\/revisions"}],"predecessor-version":[{"id":3921,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/3916\/revisions\/3921"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=3916"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=3916"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=3916"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}