{"id":4434,"date":"2016-01-06T17:27:45","date_gmt":"2016-01-06T22:27:45","guid":{"rendered":"http:\/\/vivanext.com\/blog\/?p=4434"},"modified":"2016-01-06T17:30:44","modified_gmt":"2016-01-06T22:30:44","slug":"winter-scoop","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2016\/01\/06\/winter-scoop\/","title":{"rendered":"winter scoop"},"content":{"rendered":"<p><a href=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2016\/01\/Jan06_blog_Winter_works.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-4435\" title=\"winter scoop\" src=\"http:\/\/vivanext.com\/blog\/wp-content\/uploads\/2016\/01\/Jan06_blog_Winter_works.jpg\" alt=\"winter scoop\" width=\"450\" height=\"303\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2016\/01\/Jan06_blog_Winter_works.jpg 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2016\/01\/Jan06_blog_Winter_works-300x202.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>Winter may have been a little delayed this year, but judging from the frigid temperature outside\u2026 it\u2019s here. Although our construction crews might not be able to continue to work in this cold weather, some work is still being done. Even in construction areas, winter maintenance and road clearing will still be done throughout the winter months.<\/p>\n<p>All of our rapidway projects are at different stages, either open or underway. Each piece of each project is unique, and detailed designs are refined before we even get started on construction. Then there\u2019s always coordination to be done with utility companies and municipalities, so we work on that ahead of time to help construction go smoothly in the spring. When a project is almost done, there\u2019s a lot of technical testing, plus communications to local residents and commuters throughout the project\u2019s life.<\/p>\n<p>Even when things slow down due to the weather outside, we\u2019re busy inside. Construction management teams are carefully scheduling work for 2016, and designers are completing detailed plans.<\/p>\n<p>As snow falls outside, your local municipality [e.g., Newmarket, Vaughan, Richmond Hill, Markham] will clear the sidewalks, <a title=\"York Region's Roads Branch\" href=\"http:\/\/www.york.ca\/wps\/portal\/yorkhome\/transportation\/yr\/roads\/!ut\/p\/a1\/rVTJboMwFPyWHnJEfjEYu0eXpixZ1TZq4BKxhzQYQtyo6dcXaE-VEpoI397zeDQzsgZ5aIU84R-z1JdZIfxdM3v62uambVljcOYaM4DDnDuYMhgtSA1wawCcORza9xhrujU0wAFrzsB-ogvyyKwhjDF6Qx7yQiFLuUHuqVqHhZCxkAM4FdV7PRxkJj_axabI4wHIyheHsqhkq3AAVeFHh4aj9NM4ig9ZKtopzCLkYpKEhIWxAgH2FY3Se4WFKiiRhvUgIDGhQfDr4ILEjgRaBx0ZXEwB0w5ArcGtRdJzKpagoZcrXXcQ6n0Tkr4Jac-EZt8ZmrdadmwwhrwmNNWRChzbBntQHTajat8K-86Q9Z0h6_sfsustO_-oQFxNjWnalJDcKJlICrT6Kab6Ltvu9x6vS65ptk-JVje3XJkvc7ZNJvqz9fWa5Pl6NlP8gIFKyuOfxe444XffWZEtWQ!!\/dl5\/d5\/L2dBISEvZ0FBIS9nQSEh\/#.Vow6t_nR9D8\" target=\"_blank\">York Region\u2019s Roads branch<\/a> is responsible for clearing the rapidway lanes [<a title=\"Youtube video by York Region's Roads Branch\" href=\"https:\/\/www.youtube.com\/watch?v=s5CG41LQ7o4&amp;list=PLAA525DD6BBD2B3DE&amp;index=6\" target=\"_blank\">see their video!<\/a>] and <a title=\"YRT\/Viva website\" href=\"http:\/\/yrt.ca\/\" target=\"_blank\">YRT\/Viva operations<\/a> staff look after the vivastation platforms.<\/p>\n<p>We know that everyone wants to know what\u2019s happening, so we\u2019ll be sending out updates regularly. If you\u2019d like to receive announcements and construction notices about work in your area, be sure to <a title=\"subscribe on our website for construction updates\" href=\"http:\/\/www.vivanext.com\/subscribe\/\">sign up for updates<\/a>.\u00a0 So&#8230; that&#8217;s the scoop for this winter &#8211; inside and out!<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Winter may have been a little delayed this year, but judging from the frigid temperature outside\u2026 it\u2019s here. Although our construction crews might not be able to continue to work in this cold weather, some work is still being done. Even in construction areas, winter maintenance and road clearing will still be done throughout the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[53],"tags":[654,471,653,470,7,469,651,652,9],"class_list":["post-4434","post","type-post","status-publish","format-standard","hentry","category-general","tag-cold-weather","tag-maintenance","tag-plow","tag-snow","tag-vivanext","tag-winter","tag-winter-scoop","tag-work","tag-york-region"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/4434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=4434"}],"version-history":[{"count":2,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/4434\/revisions"}],"predecessor-version":[{"id":4438,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/4434\/revisions\/4438"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=4434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=4434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=4434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}