{"id":5272,"date":"2017-12-11T15:51:53","date_gmt":"2017-12-11T20:51:53","guid":{"rendered":"http:\/\/yrrtc.ca\/?p=5272"},"modified":"2017-12-11T15:51:53","modified_gmt":"2017-12-11T20:51:53","slug":"transit-gets-epic-in-vaughan-this-sunday","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2017\/12\/11\/transit-gets-epic-in-vaughan-this-sunday\/","title":{"rendered":"Transit gets epic in Vaughan this Sunday"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5273\" src=\"http:\/\/yrrtc.ca\/vivanext.com\/blog\/wp-content\/uploads\/2017\/12\/Blog_Corp_2017_12_11_BeMoved_MediaEvent.jpg\" alt=\"\" width=\"450\" height=\"281\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2017\/12\/Blog_Corp_2017_12_11_BeMoved_MediaEvent.jpg 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2017\/12\/Blog_Corp_2017_12_11_BeMoved_MediaEvent-300x187.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/p>\n<p>Get ready for the game-changer. Transit is about to get epic at the Vaughan Metropolitan Centre [VMC], and you\u2019re invited. On Sunday, December 17, this public launch event is set to change the face of transit forever in York Region.<\/p>\n<p>The public opening of the TTC Line 1 Subway Extension will make history, as the first subway ever in York Region brings transit customers up to Vaughan Metropolitan Centre.<\/p>\n<p>Today was another great day for integrated transit connections in the York Region and the GTHA \u2013 as we celebrated the official opening of the newest bus rapid transit [BRT] rapidway segment and Vaughan Metropolitan Centre [VMC] Station on Highway 7 West. This new vivastation will be fully connected to the new VMC subway station.<\/p>\n<p>Bus rapid transit meets subway for the first time!<\/p>\n<p><strong>you\u2019ll be moved! <\/strong><\/p>\n<p>The new rapidway section runs west of Jane Street to Edgeley Boulevard, with dedicated centre lanes that will whisk riders to the VMC with faster and more consistent travel times. Including the previously completed section, the rapidway will run the full 3.6 kilometres from Bowes Road to Edgeley, the bus-only lanes clearly marked for drivers with red asphalt.<\/p>\n<p>Coming in 2018, SmartCentres Place Bus Terminal will complete the transit powerhouse at VMC, as YRT buses begin providing services from this <a href=\"http:\/\/www.vivanext.com\/project_TerminalVaughan\">stunning new bus terminal<\/a>.<\/p>\n<p><strong>an extraordinary station<\/strong><\/p>\n<p>Along with the rapidway comes an extraordinary vivastation for a new downtown destination \u2013 the Vaughan Metropolitan Centre rapidway station. The design supersized our traditional vivastation arched glass canopies, inspired by historic and modern European transportation architecture. The open, airy, domed glass canopy shelters the road and station.<\/p>\n<p><strong>the future is now<\/strong><\/p>\n<p>It\u2019s only 43 minutes via subway to downtown from the VMC, but there\u2019s no need to go anywhere. If you\u2019re at Vaughan Metropolitan Centre, you\u2019ve already arrived!<\/p>\n<p>Welcome to the brilliant future of transit-oriented development, right here, right now in York Region. The VMC shows what it\u2019s all been about: rapid transit connections that fuel livable, walkable, desirable communities, spur jobs and economic growth, creating places where we all want to live, work and play.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Get ready for the game-changer. Transit is about to get epic at the Vaughan Metropolitan Centre [VMC], and you\u2019re invited. On Sunday, December 17, this public launch event is set to change the face of transit forever in York Region. The public opening of the TTC Line 1 Subway Extension will make history, as the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,603,77,96,626,53,30,67,59,19],"tags":[40,39,434,8,14,146,10,117,48,175,70],"class_list":["post-5272","post","type-post","status-publish","format-standard","hentry","category-announcements","category-commissioning-2","category-community-events","category-construction","category-facilities-and-terminals","category-general","category-rapidways","category-stations","category-subways","category-urban-planning","tag-brt","tag-bus-rapid-transit","tag-commissioning","tag-connections","tag-rapid-transit","tag-spadina-extension","tag-subway-extension","tag-transit-oriented-development","tag-vaughan","tag-vaughan-metropolitan-centre","tag-vivastation"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=5272"}],"version-history":[{"count":2,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5272\/revisions"}],"predecessor-version":[{"id":5275,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5272\/revisions\/5275"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=5272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=5272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=5272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}