{"id":5528,"date":"2019-01-14T15:30:30","date_gmt":"2019-01-14T20:30:30","guid":{"rendered":"http:\/\/yrrtc.ca\/?p=5528"},"modified":"2019-01-14T15:30:30","modified_gmt":"2019-01-14T20:30:30","slug":"positive-progress-and-multiple-milestones-reached-year-in-review-for-bathurst-centre-and-highway-7-west-in-vaughan","status":"publish","type":"post","link":"https:\/\/yrrtc.ca\/blog\/2019\/01\/14\/positive-progress-and-multiple-milestones-reached-year-in-review-for-bathurst-centre-and-highway-7-west-in-vaughan\/","title":{"rendered":"positive progress and multiple milestones reached >> year in review for Bathurst &#038; Centre and Highway 7 West in Vaughan"},"content":{"rendered":"<p><a href=\"https:\/\/www.youtube.com\/watch?v=xNNf2f3FJSg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-5529\" src=\"http:\/\/yrrtc.ca\/vivanext.com\/blog\/wp-content\/uploads\/2019\/01\/H2WE-YearReview-Cover.jpg\" alt=\"\" width=\"450\" height=\"262\" srcset=\"https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2019\/01\/H2WE-YearReview-Cover.jpg 450w, https:\/\/yrrtc.ca\/blog\/vivanext.com\/blog\/wp-content\/uploads\/2019\/01\/H2WE-YearReview-Cover-300x175.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p><a href=\"https:\/\/www.youtube.com\/watch?v=xNNf2f3FJSg\"><strong>watch our latest video<\/strong><\/a><strong> to see some of the milestones from 2018<\/strong><\/p>\n<p>It was a year of sometimes messy construction on the Bathurst &amp; Centre and Highway 7 West projects in Vaughan in 2018 \u2013 but a lot of positive progress was made and multiple milestones were reached! As you take a look at our year-in-review video, keep in mind, the vivaNext rapidway project is scheduled to open for service in these areas at the end of this year.<\/p>\n<p>For construction updates and information about ongoing vivaNext projects, be sure to <a href=\"http:\/\/www.vivanext.com\/subscribe\/\">subscribe to email updates<\/a>, and <a href=\"https:\/\/twitter.com\/vivanext\">follow us on Twitter<\/a>. Questions or comments? Comment below or email us at <a href=\"mailto:contactus@vivanext.com\">contactus@vivanext.com<\/a>.<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>watch our latest video to see some of the milestones from 2018 It was a year of sometimes messy construction on the Bathurst &amp; Centre and Highway 7 West projects in Vaughan in 2018 \u2013 but a lot of positive progress was made and multiple milestones were reached! As you take a look at our [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[967,96,30,1088,1],"tags":[1103,39,1101,8,1102,114,497,658,48],"class_list":["post-5528","post","type-post","status-publish","format-standard","hentry","category-bridge-expansion","category-construction","category-rapidways","category-suburban-to-urban-transformation","category-uncategorized","tag-bathurst-centre","tag-bus-rapid-transit","tag-concrete","tag-connections","tag-culvert","tag-highway-7","tag-paving","tag-red-asphalt","tag-vaughan"],"_links":{"self":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/comments?post=5528"}],"version-history":[{"count":1,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5528\/revisions"}],"predecessor-version":[{"id":5530,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/posts\/5528\/revisions\/5530"}],"wp:attachment":[{"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/media?parent=5528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/categories?post=5528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yrrtc.ca\/blog\/wp-json\/wp\/v2\/tags?post=5528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}